Enterprise hardware · New & pre-owned supply
sales@aster-rackit.com English / Global
ProductsView all products
BrandsView all brands
SolutionsView all solutions
ServicesView all services
Resources
AboutView all about
Request a quote

Configurator 3.0 · OEM dependency engine

CPU → memory → storage → GPU → cooling → network → power, linked live.

The planner now links chassis topology, processor power class, DIMM population, drive media, RAID/HBA path, boot device, GPU slots, cooling mode, OCP/PCIe networking, ambient target and PSU headroom. Rules are sourced from current Dell manuals, HPE QuickSpecs, Lenovo Press guides and Supermicro product documentation.

Dell PowerEdge R760
2U enterprise rack server32 DIMM max2 CPU max

1. Platform, chassis & CPU

Intel Xeon Scalable / Xeon Max. Planning TDP: 250W each.

2. Memory population

Installed memory1,024 GB

DDR5 RDIMM only.

3. Storage, RAID & boot

Chassis limit: 8 positions · SAS / SATA / NVMe

4. GPU & cooling

GPU TDP planning: none. Exact OEM GPU PN / riser matrix wins over generic limits.

5. Networking / OCP / AIOM

Networking is handled by the advanced PN/BOM workbench for this legacy profile.

6. Power & environment

976Wrough load
1400Waggregate PSU
25°Ctarget ambient

Live dependency stack / derived BOM notes

Storage topology: Dell PERC / supported hardware RAID

Advanced workbench

PN / BOM / cross-brand engineering workspace

Use this second layer for part-number lookup, network planning, alternative parts and quote preparation after the linked OEM-rule configurator has established the platform dependencies.

Server & network configurators

Build your configuration.

Choose your server, select components and prepare a configuration list. Our team will confirm compatibility, availability and pricing.

Browse all products
8 server platforms7174 model & part numbers160 software & support SKUs
Network platform

24 × 0.01/0.1/1 GbE · optional uplink module

Model specifications & software
Uplink module / integrated ports
Required network function
Software & support

Interactive topology

Access / leaf to upstream

Network layout
Access / leaf devices
Upstream devices
UPSTREAM 1Model / ports to be confirmedUPSTREAM 2Model / ports to be confirmedC9300-24PDEVICE 1C9300-24PDEVICE 2

4

Planned links

Not selected

Uplink ports per device

Review

Maximum listed port rate

One planned connection per device pair. Dashed links are unconfigured. Rate is a port capability, not guaranteed throughput. Upstream models and transceivers are not yet selected. This is not a stacking or Virtual Chassis group.

Review · Confirm the uplink module, port rate and transceivers required for this deployment.
Review · Choose a software or support option, or ask our team for advice.
Review · Confirm upstream equipment, optics, cabling, airflow, power, software release and required base entitlements before ordering.

Installation notes

  • Airflow, power, software release and optics require review.

Configuration planning

Build the full picture of your installation.

Use the selectors above to prepare your list. Include existing parts and installation constraints so missing accessories and incompatible combinations can be discussed before ordering.

01

Choose the exact platform

Select the full server or network model. Closely named models and chassis variants may have different slots, power and accessory requirements.

02

Select parts and requirements

Add component quantities and complete the available installation fields. For networks, include link speeds, optics and software requirements.

03

Review and share the list

Address flagged conflicts, keep any open questions and prepare the configuration text. Share the draft with your sales contact for a complete offer.

Server planning

Plan beyond CPU, memory and capacity.

Memory population
Account for the number of installed processors, DIMM generation, capacity, ranks and the model-specific slot arrangement.
Storage installation
Identify the drive interface and physical format, backplane, controller, carriers and cables. Include boot storage as a separate requirement.
Power & thermal requirements
Confirm AC or DC input, available voltage, PSU selection, fans, heatsinks and inlet conditions. Complete-system power capacity still needs review.
Expansion & mechanical parts
Account for risers, adapter positions, rails and other accessories. A part-number match does not confirm that a slot remains available.

Network planning

Connect the hardware and software requirements.

01

Ports & topology

Define the role of each switch and the links between devices. Keep management, stacking and data links separate in the requirement.

Choose a network model
02

Optics & cabling

Specify link speed, distance, fiber or copper media, connector and any breakout requirement. Confirm the exact module and software support.

Explore connectivity
03

Licenses & support

Check feature entitlement, purchase unit, term and target model. A support contract is not a substitute for a required software license.

Plan a network

Configuration questions

Know what the list does—and what needs confirmation.

Does a list without conflicts certify the whole system?

No. Checks cover the listed options and entered requirements. The complete system, firmware, power budget, software and installation still need confirmation.

Should I include parts already installed?

Yes. Include retained components when planning the final system so population, power, slot and accessory requirements are considered.

What if my exact platform is not selectable?

Use the catalog or parts finder and prepare the equipment list for review. Do not choose a similar model as a substitute for an exact compatibility check.

Has my request been sent when I save it?

No. The current form keeps a draft on your device. Share the prepared list with your sales contact using the contact details provided.

Discuss your requirements

Ready to review the complete configuration?

Keep the selected list and open questions together. Confirm supply, installation requirements and commercial terms with our team.

Discuss your configuration