Skip to content
Enterprise hardware · New & pre-owned supply
sales@aster-rackit.comEnglish / Global
Quote basket 0Configure system →
☰
SIDE-BY-SIDE TECHNICAL RECORDS

Compare evidence without inventing the blanks.

Select up to four identities. Matching a field does not establish replacement compatibility.

Recorded fieldPowerEdge XE9680Dell
Identity typemodel
Evidence statusOEM fields reviewed · see remaining checks
OEM review · chassis6U rack; height 263.2mm
OEM review · cpuTwo Intel Xeon Scalable processors: 4th Gen up to 56 cores or 5th Gen up to 64 cores
OEM review · gpu layout8-GPU platforms listed: HGX H100, HGX H200, AMD MI300X or Intel Gaudi3
OEM review · memory32 DDR5 RDIMM slots; maximum 4TB; up to 5600 MT/s with 5th Gen CPUs
OEM review · storageUp to 8 2.5-inch SSDs or 16 E3.S NVMe; Gaudi3 limited to 8 2.5-inch NVMe
OEM review · power2800W Titanium redundant hot-swap; 200-240VAC or 240VDC
OEM review · networkOptional OCP 3.0 and dual-1GbE LOM
OEM review · management interfaceiDRAC9; dedicated RJ45; Redfish
OEM review · pcieUp to 10 Gen5 x16 slots; 8 with Gaudi3
01

Configuration & comparison — the next decisions

Configuration & comparison

Configuration & comparison

Define workload, capacity, constraints and growth needs.

This guide adds the decisions, documents and next steps that support this page.

System configurator
Configuration & comparison illustrative environment
02

Choose the right route

03

Details that change the configuration

Requirements

Define workload, capacity, constraints and growth needs.

Dependencies

Check component support, physical fit, power and firmware.

Review output

Export a reviewable requirement or quotation draft.

04

From requirement to handover

  1. 01

    Set project constraints

  2. 02

    Build candidate configuration

  3. 03

    Review dependencies

  4. 04

    Prepare RFQ

A planning sequence, not a record of completed work.

05

Explore the relevant catalog

All manufacturers

Recorded catalog identities

Counts show records in the site catalog. They do not represent stock, available quantities or verified compatibility.

Snapshot: 2026-09-15

06

Compare the buying requirements

Configuration & comparison comparison brief
DecisionRecord in your briefEvidence to retain
RequirementsDefine workload, capacity, constraints and growth needs.Complete identifier and source revision
DependenciesCheck component support, physical fit, power and firmware.Platform document or written clarification
Review outputExport a reviewable requirement or quotation draft.Offered-unit details and agreed scope
Open the comparison workspace
07

Build your readiness checklist

Your preparation progress

Tick items as you prepare them. This is your personal checklist, not a hardware validation.

0 / 4 prepared0

Saved in this browser when local storage is available.

08

A closer look at the hardware

Configuration & comparison — Burnin Testing Bench facility reference
Burnin Testing Bench Explore
Configuration & comparison — Hci Appliance Stack facility reference
Hci Appliance Stack Explore
Intel Xeon Gold 6338 held at the edges by two blue-gloved hands above a blue electronics workbench; generated scene
Explore
AMD 100-000000789 held at the edges by two blue-gloved hands above a blue electronics workbench; generated scene
Explore
1 / 4

Reference-based generated scenes; actual-unit photos are available only through an explicit unit-specific request. Related models are separate catalog records, not substitutes for the item on this page.

09

Keep the supporting material together

Network planner

Retain the supporting reference with your project brief.

Open resource
10

Turn the brief into the next step

Configuration & comparison

Keep the requirement specific.

Workload requirements captured · Candidate BOM recorded · Open compatibility questions listed · Reviewer and next action assigned.