System planning
Start with the chassis and its documented dependencies.
System configuratorSelect up to four identities. Matching a field does not establish replacement compatibility.
| Recorded field | PowerEdge R7725Dell |
|---|---|
| Identity type | model |
| Evidence status | OEM fields reviewed · see remaining checks |
| Formfactor | 2U · dual socket |
| Processor | AMD EPYC 9005 |
| Memory | 24 DIMM class platform |
| Storage | Universal SFF, SAS/SATA, NVMe and E3.S configurations |
| Generation | 17G |
| Form factor | 2U rack |
| Processor platform | Two 5th Generation AMD EPYC 9005 processors; up to 192 cores per CPU |
| Memory slots | 24 DIMM slots |
| Power | Two redundant AC or DC power-supply positions |
| Storage choices | SAS/SATA, universal 2.5-inch, mixed U.2 and E3.S NVMe configurations |
| Cooling | Direct liquid cooling is optional or required for selected CPU/configuration combinations |
| OEM review · chassis | 2U rack |
| OEM review · cpu | Two AMD EPYC 9005 processors; up to 192 cores each |
| OEM review · gpu layout | Up to two double-width 450W GPUs or six single-width GPUs |
| OEM review · memory | 24 RDIMM slots; up to 24x256GB; document lists 6.14TB; 6400 MT/s at 1DPC |
| OEM review · storage | Options include 8 universal 2.5-inch, 12 3.5-inch SAS/SATA, 24 2.5-inch, or up to 40 E3.S Gen5 NVMe |
| OEM review · power | Two redundant PSUs; 800/1100/1500/1800/2400/3200W AC options and DC variants |
| OEM review · network | Two optional OCP cards; PCIe NIC options through 400GbE; FC32/64 HBAs |
| OEM review · management interface | Not confirmed |
| OEM review · cooling | Optional direct liquid cooling for selected CPU configurations |
Define workload, capacity, constraints and growth needs.
This guide adds the decisions, documents and next steps that support this page.
System configurator
Start with the chassis and its documented dependencies.
System configuratorKeep identifiers and evidence side by side.
Compare recordsBuild a port, optics and cable schedule.
Network plannerDefine workload, capacity, constraints and growth needs.
Check component support, physical fit, power and firmware.
Export a reviewable requirement or quotation draft.
A planning sequence, not a record of completed work.
Counts show records in the site catalog. They do not represent stock, available quantities or verified compatibility.
Snapshot: 2026-09-15
| Decision | Record in your brief | Evidence to retain |
|---|---|---|
| Requirements | Define workload, capacity, constraints and growth needs. | Complete identifier and source revision |
| Dependencies | Check component support, physical fit, power and firmware. | Platform document or written clarification |
| Review output | Export a reviewable requirement or quotation draft. | Offered-unit details and agreed scope |
Tick items as you prepare them. This is your personal checklist, not a hardware validation.
Saved in this browser when local storage is available.
Reference-based generated scenes; actual-unit photos are available only through an explicit unit-specific request. Related models are separate catalog records, not substitutes for the item on this page.
Continue the relevant directory or service flow.
Open resourceUse the connected tool to develop the requirement.
Open resourceRetain the supporting reference with your project brief.
Open resourceWorkload requirements captured · Candidate BOM recorded · Open compatibility questions listed · Reviewer and next action assigned.