Enterprise hardware · New & pre-owned supply
sales@aster-rackit.com English / Global
ProductsView all products
BrandsView all brands
SolutionsView all solutions
ServicesView all services
Resources
AboutView all about
Request a quote
GPU-dense servers for AI training, inference, HPC and visual computing. buying detailModel-specific presentation · exact unit photos with quote

Category depth

Built for international hardware buyers who need detail.

We connect product selection, condition, configuration, accessories, packing and destination logistics in one clear offer.

Named modelsCompare named product families and model references before requesting verified availability and a formal offer.
Configuration reviewCPU, memory, storage, optics, licenses, controllers and accessories are reviewed where relevant.
Condition choiceFactory-new and inspected pre-owned options are separated clearly in the offer.
Export supportPacking, labels, delivery route and destination requirements are included before the final offer.

Plan the complete order

Selection, inspection and delivery.

Continue with the practical details for your servers.

01

Build your parts list

Start with the exact server model. Select processors, memory and accessories, then review installation requirements before requesting a complete-system quotation.

Open configurators
02

See the test workshop

Discuss the inspection you need for the offered systems, including startup screens, installed configuration and available test records. Ask about a workshop visit.

Explore the workshop
03

Prepare for delivery

Confirm rails, carriers, regional power cords and the packing plan. For multi-server orders, agree on unit identification and shipment grouping before dispatch.

See packing & dispatch

AI infrastructure buying guide

Plan compute, network, storage, power and cooling as one AI system.

An 8-GPU server is only one part of the project. We connect GPU generation, host CPU and memory, high-speed NIC/HCA layout, 200G/400G/800G fabric, storage throughput, optics, power, cooling and expansion into one purchasing path.

01

AI training teams

Scale-out H100, H200, B200 and B300 projects where east-west bandwidth and validated fabric design matter.

02

Enterprise inference operators

Compact clusters using L40S, RTX PRO 6000 and similar accelerators for private AI services.

03

Cloud, HPC and research buyers

Teams comparing Ethernet/RoCE and InfiniBand architectures across multiple rack and budget stages.

Before we quote

The information that turns a request into the right offer.

You can start with partial information. These are the decisions our team closes with you before order confirmation.

DecisionWhat we reviewWhat you receive
GPU node planServer model, GPU type/count, CPU, memory and GPU/NIC localityA node-by-node configuration schedule
Fabric designEthernet/RoCE or InfiniBand, NIC/HCA count, blocking target and failure stateTopology, port map and switch shortlist
Storage pathTraining data size, protocol, throughput, metadata and checkpoint behaviorSeparate storage and compute-fabric requirements
Facility fitRack depth, total weight, voltage, PDU, power, cooling and cable routesRack, power and thermal notes before shipment

Inside the supply process

Product, configuration and delivery shown in context.

AI room planning context for GPU-dense servers for AI training, inference, HPC and visual computing.
PLANNING CONTEXT · EXACT PRODUCT PHOTOS SUPPLIED BEFORE ORDERAI room planning contextIllustrative planning view for compute, switching and cable layout; exact equipment is confirmed in the project BOM.
200G, 400G and 800G planning for GPU-dense servers for AI training, inference, HPC and visual computing.
PLANNING CONTEXT · EXACT PRODUCT PHOTOS SUPPLIED BEFORE ORDER200G, 400G and 800G planningProduct-family context for comparing fabric classes; exact switch model and front/rear photographs are confirmed before order.
Optics, NICs and cable BOM for GPU-dense servers for AI training, inference, HPC and visual computing.
PLANNING CONTEXT · EXACT PRODUCT PHOTOS SUPPLIED BEFORE ORDEROptics, NICs and cable BOMTransceivers, DAC/AOC and module choices are checked before the offer.

What appears on the offer

Commercial detail buyers can approve with confidence.

Claims are tied to the exact model, serial status, configuration and destination shown on the quotation.

01A clear final bill of materials

The offer separates the main unit, selected options, required accessories and any software or subscription items.

02Condition and inclusion statement

Condition, included rails, bezels, caddies, cables, documentation and packaging are stated before order confirmation.

03Compatibility review

Selected parts are checked against current manufacturer documentation and available configuration tools.

04Indicative project timeline

Validation, allocation, testing, packing, export clearance and transit are shown as separate milestones.

05Warranty path in writing

Provider, duration, service level, covered geography and material exclusions appear on the quote.

06Return and RMA terms

The offer or sales contract states the DOA notice window, written RMA process, return-freight responsibility, inspection or restocking charges, non-returnable configured or licensed items, remedy and return location.

07Delivery and Incoterm detail

The named destination, packed size, freight method and quoted Incoterms® 2020 rule are recorded clearly.

Project path

From requirement to international delivery.

01

Tell us what must work

Send the model, workload, quantity, preferred condition, deadline and destination.

02

Review the technical fit

We close configuration, compatibility, licensing, power, accessories and acceptable alternatives.

03

Approve the documented offer

You review availability, condition, inclusions, warranty, timeline, packing and freight terms.

04

Prepare, pack and hand over

Testing or seal review, photos, protective packing, export documents and carrier handover follow the approved scope.

Buyer questions

Answers before the first purchase order.

Should an H100 or H200 cluster start at 400G?

Often, but not automatically. The correct speed depends on node interfaces, workload traffic, storage design, rack count, blocking target and future scale.

When does 800G make sense?

It is useful for newer high-density nodes, high-radix spine layers, dual-400G breakouts and designs intended to reduce fabric tiers.

Do you quote optics and cables with the switches?

Yes. A complete project can include NIC/HCA, optics, DAC/AOC, fiber trunks, patching direction, cable length and spare quantities.

Can you guarantee non-blocking performance?

Only after the node interfaces, topology, cable plan, failure behavior and workload have been calculated. We do not make a blanket performance claim from switch speed alone.

What information speeds up an AI quote?

Send GPU/server type, current and target node count, workload, NIC/HCA layout, preferred fabric, storage throughput, rack power and delivery location.

Servers quote desk

Send the model, quantity and destination.

We will reply with practical options, condition notes, accessories, lead time and international delivery support.